Pengembangan Sistem Monitoring Pengelolaan Anggaran Investasi
DOI:
https://doi.org/10.30651/blc.v18i2.7140Abstract
This study describes the management of investment budgets in PT. Pembangkitan Jawa Bali. The investment budget that has been running has not reached the target. During its development, it was found that there was a difference between revenue in the contract with planning budget and realization. The root cause problem-solving method was chosen to determine the root of the problem and solution. The results of the analysis show that one of the factors causing gaps is partial monitoring. Therefore, an integrated monitoring system was created to controlling the execution of the investment budget. This system is expected to facilitate management in deciding on the investment budget.
Â
Keywords                   : Budget, Gap Analysis, Investment, Monitoring System, Revenue
Correspondence to       : pu3.rositawati@gmail.com
Â
Penelitian ini memaparkan terkait pengelolaan anggaran investasi di PT. Pembangkitan Jawa Bali. Anggaran investasi yang dikelola selama ini belum mencapai target yang ditetapkan. Dalam perkembangannya, ditemukan bahwa terdapat perbedaan antara nilai pendapatan di kontrak dengan rencana kerja anggaran unit dan realisasinya. Metode root cause problem solving dipilih untuk mengetahui akar masalah dan solusi terkait ini. Hasil analisis menunjukkan bahwa salah satu faktor penyebab munculnya gap adalah monitoring yang masih bersifat parsial. Oleh karena itu, dibuatlah sebuah sistem monitoring yang terintegrasi untuk mengawal eksekusi anggaran investasi. Sistem ini diharapkan dapat memudahkan pengambilan keputusan manajemen atas progress anggaran investasi.
Â
Kata Kunci                 : Anggaran, Investasi, Gap analisis, Pendapatan, Sistem monitoring
References
Badan Perencanaan Pembangunan Nasional. (2009). Pedoman Evaluasi Kinerja Pembangunan Sektoral. BPPN, 35.
Mahachandra, M., Situmorang, W., & Handayani, N. U. (2019). Implementasi 5S dengan Teknik Root Cause Problem Solving pada Gudang Logistik PT. PLN (Persero) Area Lubuk Pakam. Seminar Nasional IENACO, 222–227.
Pembangkitan Jawa Bali, P. (2019). Perjanjian Induk antara PT PLN (Persero) dengan PT Pembangkitan Jawa Bali tentang Pengelolaan Aset Pembangkit PLTU di Wilayah Sumatra. In PT PLN (Persero) (Vol. 53, Issue 9).
Pratiwi, O. E. (2010). Teknik Penjadwalan Proses Produksi Batik Motif Kembang Api Dengan Metode Pert Dan Cpm Pada Pt. Batik Semar Surakarta. UNS.
Sony Y, D. (2005). Penganggaran Sektor Publik. Bayumedia Publishing.
Yudha, B. S., Haryono, I., & Suwarsono, L. W. (2017). Perancangan Job Description Kerangka Business Process Pada CV. Gradient. E-Proceeding of Engineering, 4(2), 2529–2534.
Adafin, J. (2019). An Assessment of Risk Factors Impacting Budget Variability in New Zealand Commercial Construction Projects. Research Gate, Res. Gate. https://www.researchgate.net/publication/337877479_An_Assessment_of_Risk_Factors_Impacting_Budget_Variability_in_New_Zealand_Commercial_Construction_Projects
Downloads
Published
Issue
Section
License
Hak Cipta
- Hak cipta terhadap artikel yang diterbitkan di BALANCE: Economic, Business, Management, and Accounting Journal adalah penerbit atau BALANCE: Economic, Business, Management, and Accounting Journal.
- Penulis harus menyerahkan hak cipta pada jurnal dengan menandatangai dan mengirimkan form penyerahan hak cipta (template) melalui email balance@um-surabaya.ac.id.
- Penulis dapat menyebarluaskan artikelnya melalui media manapun.
Lisensi
Setiap karya yang ditulis penulis dilisensi dengan Creative Commons Attribution-NonCommercial 4.0 International License.