POWER REQUIREMENT ANALYSIS FOR THE SURABAYA INTELLIGENCE TRANSPORT SYSTEM BUILDING (SITS)

Penulis

  • Nurul Huda UM Surabaya
  • Suhariyanto Institut Teknologi Sepuluh Nopember Surabaya

Abstrak

Surabaya is the capital city of East Java province, which has a large area of ± 335.28 km², with a population of 2,972,801 (2022). Surabaya as a big city has public street lighting (PSL) from 2017 to 2023 amounting to 557,512 points. To facilitate the monitoring of PSL throughout the Surabaya area, the Surabaya Transportation Agency Government plans to build a PSL monitoring room which will be allocated in the Surabaya Intelligent Transport System (SITS) building which is located on the 2nd floor close to the ATCS monitoring room so that it is centralised. In achieving the plan, it is necessary to analyse the power requirements of the SITS building before and after the addition of PSL monitoring room by comparing the capacity of the existing generator. SITS building power before the addition of PSL monitoring room is 47.366 kW, while the power requirement after the addition of PSL monitoring room is 58.609 kW. Generator power of 110 kW is greater so it does not require additional generator capacity.

Biografi Penulis

Nurul Huda, UM Surabaya

Mechanical Engineering Department

Suhariyanto, Institut Teknologi Sepuluh Nopember Surabaya

Industrial Mechanical Engineering Department

Referensi

Ali, Dedi, Ida. 2022. Evaluasikapasitas AC Pada Gedung Fakultas Teknologi Industri Unissula Semarang. Semarang

Arikunto, Suharsimi. 2006. Evaluasi Program Pendidikan. Jakarta: PT. Bumi Aksara.

BandriSepannur. 2013. AnalisaPengaruh Beban Terhadap karakteristik Generator Sinkron (Aplikasi PLTG Pauh Limo Padang). Padang

Baso, Mukhlis. 2011.Evaluasi Penggunaan Listrik Bangunan Gedung di Lingkungan UniversitasTadaluko. Jurnal Ilmiah Foristek Universitas Tadaluko

Belo, T.D. 2016. Analisis Kebutuhan Daya Listrik di gedung Perkuliahan 10 Lantai Universitas Pakuan Bogor.

Dinas Perhubungan Kota Surabaya 2014. “ATCS, SITS (Surabaya Intellegent Transport System)”. Power Point Presentation. Dilihat pada 10 Oktober 2023 http://sits.dishub.surabaya.go.id

Hari Atmoko, Eko. 2005. Membuat Sendiri CCTV Berkelas Enterprise dengan Biaya Murah. Andi offset . Yogyakarta

Hidayah Aprilawati. 2007. Perancangan Unit InstalasiGenset di PT AichiTex Indonesia. Bandung

https://duniatehnik.co.id/bagian-bagian-pada-generator-set-genset/

Institut Teknologi Sepuluh Nopember Surabaya (ITS). 2022. Kajian Pembangunan Sistem Pematauan PJU Kota Surabaya.Dinas Perhubungan Kota Surabaya

https://intergengenset.com/2023/06/20/menghitung-kapasitas-daya-genset-begini-caranya/

Januar Akbar. “Studi Evaluasi Perencanaan Daya pada Instalasi Listrik di Gedung Harco Glodok Jakarta” Jourbak Universitas pakuan Bogor, Vol. 1, pp. 1-10. 2017

Jumadi & Mangapul, T, J. 2015. Analisis Pengaruh Jenis Beban Listrik Tehadap Kinerja Pemutus Daya Listrik di Gedung Cyber Jakarta. Jurnal Energi dan kelistrikan. 108-117

Kurniati, N. 2019. Optimasi Kinerja Area Traffic Control System (ATCS) di Kota Balikpapan. Jurnal Penelitian Transportasi Darat, Vol 21 (2)

Kusnandar, E. 2011. ITS untuk Indonesia. Bandung :Kementerian Pekerjaan Umum, Badan Penelitian dan Pengembangan Jalan dan Jembatan

Maulana, dkk. 2009. “Penghematan Energi Listrik pada Air Conditioning (AC)” disampaikan pada acara Bimbingan Teknis Hema tEnergi yang diselenggarakan Departemen Pendidikan Nasional.

Melipurbowo. 2016. Pengukuran Daya Listrik Real Time dengan Menggunakan Sensor Arus ACS.712. Jurnal Orbit Semarang Politeknik Negeri Semarang. Vol.12

Naibaho N, Yoverly M. 2022. Analisa Perhitungan Kebutuhan genset Stamford 670 KVA pada Apartemen Mustika Golf residence Cikarang Jawa Barat. Jurna Vol 10 1 Januari 2022

Najamudin. 2014. Cara Menghitung Kebutuhan Daya dan Kapasitas AC (Air Conditioning) Berdasarkan Volume yang digunakan.Universitas Bandar Lampung

Nomon, Atman, Zulfahri. 2018. Studi Peralihan Daya Listrik Dari PLN Ke Generator Set (Genset) Ketika Terjadi Pemadaman Dari PLN dengan Uninterruptible Power Supply (UPS) Pada Hotel Grand Elite Pekanbarui.Jurnal Sain, Energi, Teknologi&Industri, Vol 3 No. 1

Ponto Hantje. 2018. Dasar Teknik Listrik. Yogyakarta: Deepublish

Power, s. 2017. Basic Structur Application of Deasel Generator Set. Retrieved from https://www.dieselgeneratortech.com

Rudini, R., Priatna, E. and Usrah, I. (2021) ‘Analisis Pencahayaan Penerangan Jalan Umum Di Jalan Tol Kabupaten Pangandaran Dan Peluang Hemat Energi’, Journal of Energy and Electrical Engineering, 3(1). Available at: https://doi.org/10.37058/jeee.v3i1.2693.

Sahaan, Sudirman. 2021. Perawatan dan Perbaikan Generator Set (Generator Genset) Pembangkit Listrik. Universitas Medan Area

Wayan, I Sawendra. 2018. Metodologi Penelitian Kualitatif dalam ilmu Social. Pendidikan, Kebudayaan dan Keagaman. Bandung :Nilacakra Publishing House

Shafa Y.Y, Iqbal M, Hijroh T.G, Didik A. Analisa Kebutuhan Daya Listrik yang Terpasang pada Gedung CC Fkip Untirta Lantai 1 sampai 3. JUPRIT Vol.2, No. 2 Mei 2023

SNI (Standard Nasional Indonesia). 2001. Tata cara perancangan system pencahayaan buatan pada bangunan gedung

Sugiyono. 2021. Metode Penelitian Kuantitatif, Kualitatif,dan R&D. Bandung: Alfabeta

Wu, Q, He, F, & fan, X. 2018. The Intelligent Control System of Traffic Light Base on Fog Computing. Chinese Journal of Electronics, 27(60, 1265-1270)

Diterbitkan

2024-09-24

Cara Mengutip

Huda, N., & Suhariyanto. (2024). POWER REQUIREMENT ANALYSIS FOR THE SURABAYA INTELLIGENCE TRANSPORT SYSTEM BUILDING (SITS). Rekayasa Sistem Energi Dan Manufaktur (ReSEM), 2(2), 119–128. Diambil dari https://journal.um-surabaya.ac.id/ReSEM/article/view/21912