Penerapan Metode Modifikasi Andersen Dalam Penilaian Risiko Bendungan Haliwen ANDERSEN MODIFICATION METHOD APPLICATION IN HALIWEN DAM RISK ASSESSMENT

Muhammad Fuad Maulana (1), Sukamta (2), Dyah Ari Wulandari (3)
(1) a:1:{s:5:"en_US";s:22:"Universitas Diponegoro";}, Indonesia,
(2) Jurusan Teknik Sipil, Fakultas Teknik, Universitas Diponegoro, Indonesia,
(3) Jurusan Teknik Sipil, Fakultas Teknik, Universitas Diponegoro, Indonesia

Abstract

Indonesia is a disaster-prone country; therefore, all infrastructure must be risk-analyzed in order to carry out mitigation efforts. One of the infrastructures that holds the potential for high risk of danger is a dam. Dams need to be inspected regarding dam operations, maintenance, and safety, one of which is through regular inspections. The results of the inspection can be used to analyze dam risks. The Haliwen Dam was originally a reservoir whose classification was upgraded to dam due to the enactment of Minister of Public Works Regulation No. 27 of 2015 concerning Dams. The Haliwen Dam needs to be analyzed for its risks as a dam. The method for analyzing the risk of dams can use the modified Andersen method. This method works well for dams with limited information during construction and instrumentation. This research requires a report on the results of field inspections to determine the physical condition of the dam. The end result of this analysis is the dam risk condition in the form of a safety value (Naman). The safety value obtained is 80. Based on the risk assessment of the modified Andersen method, the Haliwen Dam has a safety value above 75 (satisfactory), which means that the dam is in good condition and has a low risk of failure. A satisfactory safety value means that the dam can operate properly at ordinary (normal) and extraordinary load times.

Full text article

Generated from XML file

References

DAFTAR PUSTAKA

Andersen, G., Chouinard, L., Hover, W., & Cox, C. (2001). “Risk Indexing Tools to Assist in Prioritizing Improvements to Embankment Dam Inventories”. J. Geotech, Geoenvironmental Eng, 325-334.

BWS Nusa Tenggara II. (2021). Laporan Pemeriksaan Besar Bendungan Haliwen. Kupang.

Chouinard, L., Andersen, G., Robichaud, J., Blanchette, G., & Gervais, R. (1998). “Priority Ranking for Maintenace Activities on Embankment Dams”. 1st Annual Conference System Stewardship for Dams & Reservoirs .

Indrawan, D. (2013). “Penilaian Indeks Risiko Metode Modifikasi Andersen dan Modifikasi ICOLD untuk 12 Bendungan di Pulau Jawa”. Jurnal Sumber Daya Air, 93-102.

International Organization for Standardization. (2018). Occupational health and safety management systems—Requirements with guidance for use.

Ishbaev, A., Pandjaitan, N., & Erizal. (2014). “Evaluasi Keamanan Dam Jatiluhur Berbasis Indeks Resiko”. Jurnal Pengelolaan Sumberdaya Alam dan Lingkungan, 111-118.

Kementerian Pekerjaan Umum. (2011). Pedoman Teknis Penilaian Resiko Bendungan. Jakarta.

Lave, L. B., & Balvanyos, T. (1998). “Risk Analysis and Management of Dam Safety”. Risk Analysis 18(4), 455–462.https://doi.org/10.1111/j.1539-6924.1998.tb00360.x.

Poff, N. L., & Schmidt, J. C. (2016). “How dams can go with the flow”. Science, 353(6304), 1099– 1100. https://doi.org/10.1126/science.aah4926.

Pramudawati, M., Tanjung, M., & Ghafara, R. (2020). “Dam Safety Risk Assesment in East Java”. Jurnal Teknik Hidraulik, 93-102.

Su, H. Z., Hu, J., & Wen, Z. P. (2013). “Optimization of reinforcement strategies for dangerous dams considering time-average system failure probability and benefit–cost ratio using a life quality index”.

Authors

Muhammad Fuad Maulana
m_fuad_m@pu.go.id (Primary Contact)
Sukamta
Dyah Ari Wulandari
Maulana, M. F., Sukamta, & Dyah Ari Wulandari. (2024). Penerapan Metode Modifikasi Andersen Dalam Penilaian Risiko Bendungan Haliwen: ANDERSEN MODIFICATION METHOD APPLICATION IN HALIWEN DAM RISK ASSESSMENT. AGREGAT, 9(1), 978–983. https://doi.org/10.30651/ag.v9i1.20450

Article Details

No Related Submission Found