Pengukuran dan Analisis Kualitas Daya Listrik di IGD dan IKBS Rumah Sakit Islam Purwokerto
Abstrak
Artikel teks lengkap
Referensi
E. Wahyu Pramon, K. Karnoto, and T. Nurhayati, “Evaluasi Instalasi Listrik Pada Gedung Multi Centre of Excellent (Mce) Rumah Sakit Islam Sultan Agung Semarang,†eLEKTRIKA, vol. 9, no. 1, p. 17, 2018.
K. Kulkarni and V. J. Shetty, “Power Quality Issues in Healthcare Centre,†Res. Artic. Int. J. Curr. Eng. Technol., vol. 4, no. 3, pp. 3–6, 2014.
M. Ari, Emergensi Energi Listrik Pada Kamar Operasi Di Rumah Sakit Menggunakan Uninterruptible Power Supplies ( UPS ). 2015.
R. Hartungi and L. Jiang, “Investigation of power quality in health care facility,†Renew. Energy Power Qual. J., vol. 1, no. 8, pp. 996–1004, 2010.
B. M. Ion, U. T. Cluj-napoca, H. Balan, and U. T. Cluj-napoca, “An electrical power quality problem in an emergency unit from a hospital - case study -,†no. May 2020, 2010.
M. I. Buzdugan and H. Bălan, “Some Power Quality Issues in Hospital Facilities Key words,†2012.
M. Ikhwanus, “Rangkaian Listrik I,†J. Chem. Inf. Model., vol. 53, no. 9, pp. 1689–1699, 2014.
J. Manurung, H. Energi, M. Ilmiah, P. Mandiri, and B. Prestas, “Pengujian Tingkat Efisiensi Lima Merek Lampu Hemat,†no. 2, 2013.
I. P. Meyyasa, R. S. Hartati, and I. B. G. Manuaba, “Analisa Kualitas Daya Listrik Instalasi Wing Amerta RSUP Sanglah Denpasar,†vol. 18, no. 2, 2019.
L. Assaffat, “Pengukuran Dan Analisa Kualitas Daya Listrik Di Paviliun Garuda Rumah Sakit Dr. Karyadi Semarang,†Media Elektr., no. Vol 2, No 1 (2009): MEDIA ELEKTRIKA, pp. 18–23, 2009.
Lutron, “3 PHASE POWER ANALYZER with harmonic measurement,†pp. 4–5.
D. Zakaria, “Bidang pembangkitan kehandalan,†no. 1, 2016.
D. Mangantar, “Analisa Efisiensi Konsumsi Energi Listrik Pada Kapal Motor Penumpang Nusa Mulia,†vol. 3, no. 1, pp. 54–60, 2014.
Ismujianto et al., “AUDIT KUALITAS DAYA LISTRIK RUMAH SAKIT JIWA Prof . Dr SOEROJO,†J. Tek. Elektro Univ. Tanjungpura, vol. 5, no. 2, pp. 1–9, 2019.
S. Suratno, “ANALISIS PENENTUAN DAYA KVAR UNTUK MENGHINDARI PINALTY PT.PLN (Persero) PADA SAMARINDA CENTRAL PLAZA,†Just TI (Jurnal Sains Terap. Teknol. Informasi), vol. 10, no. 2, p. 16, 2019.
P. Bhagavathy, R. Latha, and S. Elango, “A CASE STUDY ON THE IMPACT OF POWER QUALITY ANALYSIS IN TEXTILE INDUSTRY,†no. 978, pp. 453–456, 2018.
Standar Nasional Indonesia, “Persyaratan Umum Instalasi Listrik 2011 (PUIL 2011),†DirJen Ketenagalistrikan, vol. 2011, no. PUIL, pp. 1–133, 2011.
Penulis
Hak cipta berada di tangan penulis
Artikel yang terbit dapat digunakan di bawah lisensi Creative Commons Atribusi Non-Komersial 4.0 InternasionalÂ
Anda diperbolehkan:
Berbagi menyalin dan menyebarluaskan kembali materi ini dalam bentuk atau format apapun;
Adaptasi menggubah, mengubah, dan membuat turunan dari materi ini
Pemberi lisensi tidak dapat mencabut ketentuan di atas sepanjang Anda mematuhi ketentuan lisensi ini.
Berdasarkan ketentuan berikut:
Atribusi Anda harus mencantumkan nama yang sesuai, mencantumkan tautan terhadap lisensi, dan menyatakan bahwa telah ada perubahan yang dilakukan. Anda dapat melakukan hal ini dengan cara yang sesuai, namun tidak mengisyaratkan bahwa pemberi lisensi mendukung Anda atau penggunaan Anda.
NonKomersial Anda tidak dapat menggunakan materi ini untuk kepentingan komersial.