NOVALDY, R. dan Basuki (2025) “PROGRAM MODIFIKASI PROPORTIONAL GATE 431-PG2 MENJADI BACKUP KILN FEED PADA PT SOLUSI BANGUN INDONESIA”, Rekayasa Sistem Energi dan Manufaktur (ReSEM), 3(1), hlm. 158–165. doi: 10.30651/resem.v3i1.21933.