[1]
Doris Zhaputro, M.A. et al. 2024. APPLICATION OF TIME COST TRADE-OFF METHOD TO COST AND TIME OPTIMIZATION ON INFLUENCE REDESIGN OF THE LOWER STRUCTURE (CASE STUDY: JEC JAVA MAIN EYE CLINIC CONSTRUCTION PROJECT @PASURUAN PHASE 1). Journal of Manufacturing in Industrial Engineering & Technology. 3, 2 (Dec. 2024), 93–106. DOI:https://doi.org/10.30651/mine-tech.v3i2.24621.